For this Vancouver cinder block fence removal, RenoFiz estimated $3,275 CAD for the mandatory scope, with up to $1,750 CAD in possible additional work if disposal weight exceeds the bin allowance or the homeowner requests footing removal.

Location
Vancouver, BC (V5K)
Fence length
Approximately 100 linear feet
Fence height
Approximately 50" above footing
Condition
Leaning, poor condition
Footing
Concrete footing remains in place
Vintage
Built 1990 or newer
Disposal access
Clear access for a bin
See the full cost breakdown for this project.
| Scope item | Labour | Materials | Total |
|---|---|---|---|
| Site Mobilization & Protection | $200.00 | — | $200.00 |
| Dismantle Cinder Block Fence | $1,200.00 | — | $1,200.00 |
| Debris Loading | $1,000.00 | — | $1,000.00 |
| Site Cleanup | $300.00 | — | $300.00 |
| Waste Bin & Disposal Logistics | $100.00 | $475.00 | $575.00 |
| Complete base project cost | $2,800.00 | $475.00 | $3,275.00 |
Get an estimate, then choose to connect with pros
Conditions, constraints, and on-site decisions that shape the final project cost.
Trigger: Waste weight exceeds the standard bin tonnage allowance of approximately 5 to 7 tons.
An additional bin or weight overage fees may apply. This example identifies approximately $400 to $700 in possible additional cost.
Trigger: The existing footing is found to be structurally unsound, or the homeowner requests full removal.
Removing and disposing of the concrete footing would be added work. This example identifies approximately $950 to $1,450 in possible additional cost.
This is the how RenoFiz gathered the facts and turned a simple request into a scoped estimate.
Need a price to remove and dispose of a cinder block fence. About 100’ in total length and about 50” above footing. Concrete footing to remain in place. The fence is clearly falling over and should be easy to dismantle
I've reviewed the photos and the details you provided. Removing a leaning cinder block fence of that length is a straightforward demolition task, though the weight of the concrete and the disposal requirements in the Vancouver area are the main cost drivers.
To give you an accurate estimate, I have a few specific questions:
Question: What is your postal code?
Question: Do you know roughly what year the fence was built?
Question: Is there clear access for a disposal bin to be dropped in the driveway or alley right next to the fence?
Photos that would help The photos you sent are great for seeing the fence condition. One more would be helpful:
What is your postal code?: v5k
Do you know roughly what year the fence was built?: 1990 or newer
Is there clear access for a disposal bin to be dropped in the driveway or alley right next to the fence?: Yes, plenty of room right next to it
The homeowner wants to dismantle and haul away a leaning cinder block fence (100 LF, 50" high) in Vancouver (V5K). The fence is 1990+ vintage, so no asbestos testing is required, and there is clear access for a disposal bin. The existing concrete footing will remain.
$2,600 - $4,000
| Item | Details | Range |
|---|---|---|
| Site Mobilization & Protection | MOBILIZATION: Setup of work area protection, safety barriers, and site staging for demolition tools. | $150 - $250 |
| Dismantle Cinder Block Fence | Dismantle 100 linear feet of cinder block fence (50" high) down to the existing footing. Manual dismantling as fence is reported in poor condition/leaning. | $950 - $1,450 |
| Debris Loading | DEBRIS HANDLING: Manual loading of approximately 8 tons of masonry debris into the disposal bin. | $800 - $1,200 |
| Site Cleanup | CLEANUP: Sweep and remove concrete dust and small debris from the work area and adjacent driveway/alley. | $225 - $375 |
| Waste Bin & Disposal Logistics | Supply 14-yard debris bin for masonry waste and coordinate pickup. | $450 - $700 |
| Category | Range |
|---|---|
| Materials | $375 - $575 |
| Labour | $2,200 - $3,400 |
| Total | $2,600 - $4,000 |
These items are not included in the estimate range above. They may change after an on-site review.
| Item | Trade | Possible range | What would confirm it |
|---|---|---|---|
| Additional bin or weight overage fees if masonry weight exceeds standard tonnage limits. | General Contractor | $400 - $700 | Waste weight exceeds the standard bin tonnage allowance (approx 5-7 tons). |
| Concrete footing removal and disposal. | General Contractor | $950 - $1,450 | Existing footing found to be structurally unsound or homeowner requests full removal. |
The Request a Pro button is now active — press it to connect with a local contractor for an on-site visit and firm quote.
See other projects in Vancouver or in related trades.