For this Mission side-yard project, RenoFiz estimated $7,805 CAD for the mandatory scope (range $6,200-$9,400), with up to $700 CAD in possible additional work for tree-root removal or sheathing repair if found on site.

Location
Mission, BC (FSA V2V)
Pathway
~88 sq ft, about a 25 ft run
Window wells
3, pressure-treated frames with metal grates
Lighting
6 bollard + 6 recessed, low-voltage
Power source
Existing outdoor outlet (no new circuit)
Home age
Built 2000 (no hazmat testing triggered)
See the full cost breakdown for this project.
| Scope item | Labour | Materials | Total |
|---|---|---|---|
| Demolition & Disposal | $528.00 | $475.00 | $1,003.00 |
| Utility Locates & Layout | $75.00 | — | $75.00 |
| Electrical Permit Administration | $135.00 | $225.00 | $360.00 |
| Excavation & Base Preparation | $704.00 | $425.00 | $1,129.00 |
| Window Well Frames & Grates | $900.00 | $180.00 | $1,080.00 |
| Low-Voltage Rough-In | $540.00 | $300.00 | $840.00 |
| Pavers & River Rock Installation | $528.00 | $875.00 | $1,403.00 |
| Light Fixture Installation | $810.00 | $330.00 | $1,140.00 |
| Wooden Gate Installation | $400.00 | $375.00 | $775.00 |
| Complete base project cost | $4,620.00 | $3,185.00 | $7,805.00 |
Get an estimate, then choose to connect with pros
Conditions, constraints, and on-site decisions that shape the final project cost.
Trigger: Large roots are found obstructing the pathway or window-well excavation.
The roots are removed so the base can be built properly, estimated at $200-$300.
Trigger: Visible rot is found on the house sheathing once the old window-well structures are removed.
The damaged substrate/sheathing is repaired to protect the building envelope, estimated at $350-$550.
This is the how RenoFiz gathered the facts and turned a simple request into a scoped estimate.
I would like to improve my house pathway.
I can certainly help you scope out that pathway project. To get started, I'll need to understand the vision for the "improvement" and a few details about your property.
I'll walk you through the project from the big picture down to the technical details. First, I'll need your location to check for local requirements, and then we'll look at the scope and materials.
** Photos that would help**
Question: What is your postal code?
Question: What is the primary goal for the pathway?
Question: What material are you considering for the new or improved pathway?
Question: Approximately how long and wide is the pathway area?
Photos that would help
What is your postal code?: v2v
What is the primary goal for the pathway?: Repair or resurface the existing pathway
What material are you considering for the new or improved pathway?: I'm adding pictures of how I would like the pathway to look like
Approximately how long and wide is the pathway area?: I'm adding pictures of the pathway how it is right now
That is a fantastic vision for your side yard. The "after" photos show a high-end modern transformation that includes several distinct trades: landscaping for the pavers and rock, carpentry for the window well frames and gate, and electrical for the integrated lighting.
Based on your photos, I've outlined the project scope as follows:
To give you an accurate estimate, I need to clarify a few details:
Question: What is the approximate age of your home?
Question: Is there an existing outdoor electrical outlet or circuit nearby that can power the new pathway lighting?
Question: For the window well frames, which material would you prefer?
Question: Should the new wooden gate shown in your vision photos be included in this estimate?
Photos that would help
What is the approximate age of your home?: 2000
Is there an existing outdoor electrical outlet or circuit nearby that can power the new pathway lighting?: Yes, there is an outlet nearby
For the window well frames, which material would you prefer?: Pressure-treated wood (standard)
Should the new wooden gate shown in your vision photos be included in this estimate?: Yes, include the new gate
Continue
What is happening, I don't see any answer
The project involves replacing a gravel side-yard pathway with a modern design featuring large concrete pavers, dark river rock, and integrated low-voltage lighting. The scope includes rebuilding three window wells with pressure-treated wood and metal grates, installing six bollard lights, and replacing the existing gate with a new lattice-top wooden gate. Work will be powered from an existing outdoor outlet in a home built in 2000.
$6,200 - $9,400
| Item | Details | Range |
|---|---|---|
| Demolition & Disposal | DEMO and removal of existing gravel, broken concrete, and old wooden window well structures. Includes bin rental and disposal fees. | $800 - $1,250 |
| Utility Locates & Layout | Site assessment, layout, and utility locate request (BC One Call) prior to excavation. | $60 - $90 |
| Electrical Permit Administration | Application and administration for electrical permit for low-voltage lighting installation. | $275 - $450 |
| Excavation & Base Preparation | EXCAVATE and prepare base for pathway; install landscape fabric, edging, and granular base. | $900 - $1,400 |
| Window Well Frames & Grates | INSTALL new pressure-treated wood window well frames and black metal slotted grates. | $850 - $1,300 |
| Low-Voltage Rough-In | ROUGH-IN low-voltage electrical wiring for bollard lights and recessed window well lighting from existing outdoor outlet. | $650 - $1,050 |
| Pavers & River Rock Installation | INSTALL concrete pavers and dark river rock infill over prepared base. | $1,100 - $1,700 |
| Light Fixture Installation | INSTALL and connect 6 bollard lights and 6 recessed puck lights. | $900 - $1,400 |
| Wooden Gate Installation | DEMO existing gate and INSTALL new wooden gate with lattice top. | $600 - $950 |
| Category | Range |
|---|---|
| Materials | $2,500 - $3,900 |
| Labour | $3,600 - $5,600 |
| Total | $6,200 - $9,400 |
| Item | Why it may be needed |
|---|---|
| Electrical permit (low voltage/lighting) | Installation of new exterior lighting and wiring. |
These items are not included in the estimate range above. They may change after an on-site review.
| Item | Trade | Possible range | What would confirm it |
|---|---|---|---|
| Removal of large tree roots encountered during excavation. | General Contractor | $200 - $300 | Large roots found obstructing pathway or window well excavation. |
| Repair of rotten house substrate/sheathing behind old window wells. | General Contractor | $350 - $550 | Visible rot found on building envelope after removing old structures. |
The Request a Pro button is now active — press it to connect with a local contractor for an on-site visit and firm quote.
See other projects in Mission or in related trades.