RenoFiz estimated $6,693 CAD for a kitchen cosmetic refresh in Vancouver (range $5,300–$8,100). Includes professional cabinet painting, quartz countertop with backsplash, undermount sink and faucet installation, new electric range, and pre-1990 asbestos/lead testing.

Location
Vancouver, BC (East Vancouver)
Property type
Detached house (pre-1990)
Area
Standard kitchen footprint (same layout)
Countertops
Contractor-supplied quartz with 4-inch backsplash
Cabinets
Professional spray-painting (existing cabinets)
Range
$5,300 – $8,100
See the full cost breakdown for this project.
| Scope item | Labour | Materials | Total |
|---|---|---|---|
| Pre-1990 Asbestos & Lead Survey | $100.00 | $500.00 | $600.00 |
| Site Protection & Project Coordination | $300.00 | — | $300.00 |
| Sink & Faucet Disconnect | $36.25 | — | $36.25 |
| Electric Range Disconnect | $50.00 | — | $50.00 |
| Laminate Countertop Demolition | $87.00 | — | $87.00 |
| Cabinet Paint Preparation & Patching | $250.00 | — | $250.00 |
| Cabinet Painting (Exterior Fronts & Frames) | $300.00 | $90.00 | $390.00 |
| Quartz Countertop & Backsplash Install | $442.15 | $3,377.85 | $3,820.00 |
| Kitchen Faucet & Undermount Sink Install | $200.00 | $42.15 | $242.15 |
| Plumbing Supply Infrastructure Kit | — | $117.76 | $117.76 |
| New Cabinet Hardware Installation | $100.00 | $50.00 | $150.00 |
| New Electric Range Installation | $50.00 | — | $50.00 |
| Post-Project Cleanup & Waste Disposal | $400.00 | $200.00 | $600.00 |
| Complete base project cost | $2,315.40 | $4,377.76 | $6,693.16 |
Get an estimate, then choose to connect with pros
Conditions, constraints, and on-site decisions that shape the final project cost.
Trigger: Faucet feels loose on water-damaged MDF substrate behind the sink area.
Adds $235 for a plumber to install a faucet stabilizer plate and reinforcement.
Trigger: Deteriorated or clogged drain lines under the kitchen sink beyond simple snaking.
Adds $400 for complete drainage line re-pipe from trap arm.
This is the how RenoFiz gathered the facts and turned a simple request into a scoped estimate.
I'm planning a kitchen renovation
Thanks for sharing the photo! You've got a great, bright space with a highly functional layout to work with—that linear back wall paired with the peninsula bar in the foreground makes for an excellent workspace.
I'm Chris, and I'll be walking you through this project just like I would if I were standing in your kitchen. To build a highly accurate, professional-grade estimate, we're going to break down the work by trade complexity, starting with the biggest structural or carpentry items and moving through finishes, plumbing, electrical, and logistics. Before we dive into the specific details of the trades, let's establish the overall game plan. I need to get a sense of your high-level vision and pin down your location so we can apply the correct local building codes, permit paths, and regional trade rates.
Question: What is your postal code?
Question: Which elements in the photo are you looking to replace, keep, or add? (e.g., cabinets, countertops, flooring, appliances, sink/faucet, or adding a new backsplash)
What is your postal code?: V5K
Which elements in the photo are you looking to replace, keep, or add? (e.g., cabinets, countertops, flooring, appliances, sink/faucet, or adding a new backsplash): I want to replace my countertop; repaint the existing cabinets but keep them; new sink and faucet; new range oven
Got it! V5K puts you in the East Vancouver / Hastings Sunrise area. We'll make sure our estimate uses British Columbia-specific labor rates, permit guidelines, and CAD currency.Keeping your existing cabinet layout and repainting is a fantastic, cost-effective way to completely transform the kitchen without the massive mess and expense of a full gut. Combining that with a fresh countertop, a modern sink/faucet setup, and a new range will make this feel like a brand-new kitchen.To scope this accurately, I’ve visually estimated your countertop run at about 14.5 linear feet (including the back wall and the peninsula bar) and counted roughly 11 cabinet doors and 4 drawers in the photo. To help me dial in the trades, materials, and potential safety or building requirements, please answer a few quick questions:
Question: What type of property is this?
Question: Approximately what year was the home built?
Question: What material are you leaning toward for your new countertops?
Question: Is the new range oven electric or gas?
Question: Are you planning to supply the new sink, faucet, and range yourself?
Question: For the cabinet painting, how extensive of a repaint do you want?
Question: Are we replacing the cabinet handles and hinges, or keeping the existing ones?
What type of property is this?: Single-Family Home
Approximately what year was the home built?: Pre-1990 (Requires asbestos testing before sanding/substrate disturbance)
What material are you leaning toward for your new countertops?: Quartz (Highly durable, allows undermount sink)
Is the new range oven electric or gas?: Electric (Standard 240V plug-in)
Are you planning to supply the new sink, faucet, and range yourself?: Yes, I will purchase them (Contractor handles installation only)
For the cabinet painting, how extensive of a repaint do you want?: Exterior doors, drawer fronts, and visible face-frames only
Are we replacing the cabinet handles and hinges, or keeping the existing ones?: Replace handles and drill new holes (includes patching old holes)
Thanks for those detailed answers! That gives me exactly what we need to structure the scope. Because your home was built pre-1990, WorkSafeBC guidelines strictly mandate a hazardous materials survey (for asbestos in drywall compound/adhesives and lead in existing paint coatings) before we can do any sanding on the cabinets or remove the laminate countertops. I have built that testing step right into our project sequence.We will proceed with a professional, fine-finish spray paint of your cabinet exteriors (doors, drawer fronts, and visible face-frames), patch the old hardware holes, drill new ones for your brand-new handles, and coordinate the template, fabrication, and installation of a gorgeous new Quartz countertop with your owner-supplied undermount sink and faucet.I have one final, quick design question regarding the countertops before I run the final numbers for your estimate:
Question: For the countertop edges, do you want a matching 4-inch quartz backsplash strip installed, a new custom tile backsplash, or do you prefer to keep it as painted drywall?
For the countertop edges, do you want a matching 4-inch quartz backsplash strip installed, a new custom tile backsplash, or do you prefer to keep it as painted drywall?: Matching 4-inch Quartz backsplash strip along the walls
Cosmetic kitchen renovation in East Vancouver. Includes professional spray-painting of cabinet faces and visible frames, drilling and patching for new hardware, demolition of existing laminate counters, fabrication and installation of a new quartz countertop with a 4-inch splash, installation of owner-supplied undermount sink, faucet, and a standard electric range. Requires pre-1990 asbestos and lead testing per WorkSafeBC.
$5,300 - $8,100 This is a starting ballpark, not a final price.
| Item | Details | Range |
|---|---|---|
| Pre-1990 Asbestos & Lead Survey | Coordinate and perform third-party hazardous materials testing (asbestos and lead) on cabinet paint, countertop adhesives, and surrounding drywall prior to any sanding or demolition. | $450 - $750 |
| Site Protection & Project Coordination | Setup dust protection walls, floor masking along kitchen and travel paths, and perform multi-trade sequencing for plumbing, painting, and countertop installation. | $225 - $375 |
| Sink & Faucet Disconnect | DISCONNECT: Shut off water supply valves, disconnect under-sink drainage trap and faucet supply lines, and remove the existing drop-in kitchen sink. | $25 - $45 |
| Electric Range Disconnect | DISCONNECT: Unplug and slide out existing electric range appliance to clear area for countertop demolition and cabinet painting. | $40 - $60 |
| Laminate Countertop Demolition | Carefully remove existing laminate countertops without damaging underlying cabinet boxes; clean and prep cabinet top frames for templating. | $65 - $105 |
| Cabinet Paint Preparation & Patching | Clean, degrease, sand, and patch 15 old hardware mounting holes on cabinet doors, drawer fronts, and visible face-frames. | $200 - $300 |
| Cabinet Painting (Exterior Fronts & Frames) | REFINISH: Apply professional primer and two coats of cabinet finish paint to 11 exterior cabinet doors, 4 drawer fronts, and visible face-frames. | $300 - $475 |
| Quartz Countertop & Backsplash Install | SUPPLY & INSTALL: Template, fabricate, and install 29 sqft of new Quartz countertops and 3 sqft of matching 4-inch backsplash, including undermount sink cutout and mounting of owner-supplied sink. | $3,000 - $4,600 |
| Kitchen Faucet & Undermount Sink Install | Install owner-supplied kitchen faucet and undermount sink, and perform same-location drainage and supply line reconnect. | $175 - $300 |
| Plumbing Supply Infrastructure Kit | SUPPLY: Supply new under-sink plumbing infrastructure components including shutoff valves, braided supply lines, and P-trap kit. | $75 - $150 |
| New Cabinet Hardware Installation | Drill new mounting holes and install 15 owner-supplied knobs/pulls on painted cabinet doors and drawer fronts. | $100 - $200 |
| New Electric Range Installation | Uncrate, level, slide in, plug in, and test owner-supplied electric range oven. Secure anti-tip mounting bracket. | $40 - $60 |
| Post-Project Cleanup & Waste Disposal | Perform post-project cleanup and haul away kitchen renovation demolition waste including old laminate countertops, sink, faucet, and old range oven. | $450 - $750 |
| Category | Range |
|---|---|
| Materials | $3,500 - $5,300 |
| Labour | $1,800 - $2,800 |
| Total | $5,300 - $8,100 |
These items are not included in the estimate range above. They may change after an on-site review.
| Item | Trade | Possible range | What would confirm it |
|---|---|---|---|
| SUPPLY & INSTALL: Faucet stabilizer plate to support loose faucet on water-damaged MDF substrate. | Plumber | $175 - $300 | On-site inspection reveals water-damaged or soft MDF under-sink cabinet frame/sink deck. |
| Complete drainage line re-pipe from trap arm under kitchen sink to resolve deteriorated existing pipes. | Plumber | $300 - $500 | Existing ABS/PVC drainage pipes are cracked, leaking, or out of alignment with the new undermount sink position. |
You can keep chatting to ask questions or adjust the project — and when you're ready, a real professional will confirm the details and discuss final pricing with you, typically after seeing the space in person.
The Request a Pro button is now active — press it to connect with a local contractor for an on-site visit and firm quote.
See other projects in Vancouver or in related trades.